How to solve Dosing disk and filling rod blocking on capsule filling machine

Views: 164     Author: grandpacking     Publish Time: 2023-04-03      Origin: Site

Dosing disk and filling rod blocking on capsule filling machine

capsule filling machine dosing disk

                                                 (Click on the image to view the machine details)

What will happen if the dosing disk and filing rod block to each other on capsule filling machine?

How to use capsule filling machine 

Customer meets with this problem after producing at 33000 capsules. As per the provided video, we diagnosis this is because after customer uninstall the filling rod and dosing disk, they are not precisely matching each other when they are installed back. Therefore the dosing disk is blocked by the filling rod and the clutch get loose.

How to solve Dosing disk and filling rod blocking on capsule filling machine 

We guided customer to uninstall the filling rod, filling base and dosing disk and run the machine again, and finally customer found that the clutch get loose and fixed the problem.

 

How to solve the malfunction of the capsule filling machine 

Dosing disk and filling rod blocking on capsule filling machine 

The problem was solve in 30 minutes, we are happy to see customer is so professional.

 

Attached is a video and text about how to install a capsule filling machine dosing disk. Wish it is helpful to you.

 

 

00 seconds 1 Install the middle spacer

 

05 seconds: 2 Install the metering disc gasket

 

20 seconds: 3 install the copper spacer

 

25 seconds: 4 Install the powder baffle

 

35 seconds: 5 installation metering discs

 

50 seconds: 6 Install the powder separator or the metering disc

 

1 minute 15 seconds: 6 Install the powder spacer

 

2 points and 5 less: 7 install the filling seat

 

2 minutes and 45 seconds: 8 Install the filling rod

 

2 minutes 55 seconds: 9 Position alignment and fixing of filling rod and metering disc

 

3 minutes and 15 seconds: 9 Install the remaining 5 filling rod modules

 

3 minutes and 30 seconds: the position of the 9 filling rod is compared with the scale

 

3 minutes 55 seconds: 10 Install the filling rod and fix the screw

 

4 minutes and 30 seconds: 11 Install the filling material screw jacket

 

4 points and 50 less: 12 install the bag outlet (outlet)

 

5 minutes and 40 seconds: 13 Installation of upper and lower modules and calibration

 

6 minutes and 35 seconds: 13 install the remaining 11 modules in sequence

 

7 minutes and 10 seconds: 14 Install the lock bag device

 

ENd

 

If you are using the capsule filling now and need any help , please contact us, we will do our best to help you and provide solution.


Contact Us

Mob: +86-13706885851
         +86-13787413551
 Tel:   +86-731-84325468
 Fax:  
+86-731-84325498
Ask your questions by E-mail
sales@grand-packing.com

Language Options

Français              العربية               Pусский
Español          Português             한국어
Tiếng Việt            ไทย                Türk dili
Melayu           Bahasa indonesia
Request A Quote