Disposable Gel Strip Tube Fill Ultrasonic Seal Machine Exported To Türkiye

Views: 43     Author: Hunan Grand packing machinery     Publish Time: 2026-04-10      Origin: Hunan Grand Packing Machinery


Case Study: Strip Tube Packaging Solution for European Markets - Turkish GD-005H Tube Filling and Sealing Machine Project


1. Core Project Information (From Production Order Form)

This collaboration focuses on meeting the strip tube production needs of a Turkish client, delivering a customized solution for the GD-005H Strip Tube Filling and Sealing Machine. Key details fully align with the latest requirements of both European and Turkish markets:
  • Project Timeline: Completed delivery within 30 days from order placement (delivered on March 27, 2026), efficiently supporting the client’s urgent production schedule.

  • Equipment Standards: Simultaneously complies with European electrical specifications (single-phase 220V 50Hz) and Turkey’s latest import requirements. We proactively prepared the CE marking, EMC (Electromagnetic Compatibility) report, and noise certificate in advance.

  • Core Configuration: Equipped with a 5-head piston pump for precise filling, plus 3 sets of custom molds (3ml/5ml/10ml) to cover all small-capacity strip tube production scenarios.

  • Operational Adaptability: The touchscreen supports 3 languages (Chinese, English, Turkish), eliminating language barriers in cross-border production.

  • Daily disposable gel strip tube filling sealing machine


2. Core Features of Strip Tube Packaging & Adaptability to Eurasian Markets

Based on the technical parameters specified in the production order form, the strip tube packaging solution provided meets both European standards and local Turkish needs for the cosmetics and pharmaceutical industries:
  1. Multi-Material Compatibility: No additional heating or stirring equipment is required to stably handle gel-like and water-based materials. This prevents material composition damage during processing and aligns with EU Cosmetics GMP standards.

  2. Precise Capacity Control: Custom molds enable filling of small capacities (3ml–10ml) with an error margin of ±0.1ml, meeting Turkey’s dosage requirements for pharmaceutical preparations and skincare samples.

  3. Efficient Strip Design: Adopts a 5-tube-per-strip structure, paired with synchronized filling via the 5-head piston pump. The hourly output reaches 2,000–3,000 tubes, balancing production efficiency and transport damage resistance.


3. Verification of Professional Capabilities: Comprehensive Assurance in Technology, Quality, and Compliance

3.1 Proactive Market Compliance: Addressing Turkey’s New Regulations in Advance

As a professional provider of strip tube packaging machines, we consistently anticipate regulatory changes in target markets to help clients avoid import risks:
  • Advanced Preparation of Multiple Certificates: During the project initiation phase, we researched Turkey’s latest import policies. Beyond the standard CE marking, we additionally completed an EMC report (compliant with EN 61000 standards) and a noise test certificate (operating noise ≤75dB, meeting Turkish industrial environmental requirements). This ensures the equipment can clear customs directly upon arrival.

  • Dual Standard Compliance: The equipment is designed to meet both EU EN standards and Turkish TS standards. No post-delivery modifications are needed for the client to integrate it into local production workshop circuits and environmental systems.

3.2 European-Grade Technology and Quality Control

In line with the precise requirements of the production order form, we ensure equipment quality through end-to-end control:
  1. Careful Selection of Core Components: The 5-head piston pump uses German-imported seals. Each piece of equipment undergoes a 12-hour continuous filling test before delivery to ensure accuracy and stability.

  2. Mold Durability Testing: The 3 sets of custom molds undergo 100,000 opening-and-closing simulation tests, with anti-corrosion treatment on surfaces to adapt to Turkey’s high-temperature and high-humidity production environment.

  3. Full-Condition Commissioning: Commissioning is conducted using the client’s actual materials (gel + water-based), with commissioning videos and parameter reports recorded. The client can start production immediately after delivery.

3.3 Customized Design: Tailored to Cross-Border Production Needs

We provide design services that exceed expectations to fit the Turkish client’s specific scenarios:
  • Multi-Specification Production Support: In addition to the standard 5ml mold, 3ml and 10ml molds are provided to help the client quickly expand product lines (e.g., serums, ointments).

  • Localized Operation Optimization: A Turkish language interface is added to the touchscreen, with operation buttons marked with internationally recognized icons. This reduces training costs for local employees (training cycle shortened to 1 day).

  • Accessories and Documentation Support: Turkish-standard plugs, full English/Turkish operation manuals, and a spare parts kit (for 1 year of use) are provided to address post-delivery maintenance needs.


4. Project-Based Services: Removing Barriers Throughout the Entire Process for Cross-Border Clients

With the goal of “ensuring clients have no worries,” we extend our project services to cover compliance, logistics, and other full-cycle aspects:

4.1 Order Phase: Dual Confirmation of Requirements and Compliance

  1. A dedicated project team is established to not only refine 16 equipment technical parameters but also proactively research Turkey’s new import regulations. The EMC report and noise certificate are included in the delivery checklist.

  2. We confirm customs clearance agent information with the client and provide scanned copies of certificates in advance, ensuring the client can complete import filing simultaneously.

4.2 Production Phase: Synchronous Progress in Transparency and Compliance

  1. A weekly progress update mechanism is established to share production photos and certificate processing progress (e.g., EMC test schedule, report issuance timeline) with the client.

  2. Targeted electrical load testing is conducted for Turkey’s voltage standards to avoid adaptability issues after the equipment arrives.

4.3 Inspection and Delivery: Dual Inspection of Certificates and Equipment

  1. During pre-delivery inspection, the CE marking, EMC report, noise certificate, and equipment accuracy report are packaged together. The client can remotely verify compliance and equipment performance.

  2. A customs clearance document package (including original certificates, packing list, and invoice) is provided upon delivery. We also coordinate with logistics providers to offer local delivery services in Turkey.

4.4 Post-Sales Phase: Sustained Support in Technology and Compliance

  1. 24/7 English/Turkish remote technical support is provided, with video guidance to resolve equipment operation or malfunction issues.

  2. If Turkey updates its import regulations in the future, free equipment compliance assessment reports will be provided to assist the client in completing subsequent certification updates.



Click to check the case video.


More details,Pls contact us.

Ava Duan

Mobile/Wechat/Whatsapp: 0086-13706885851

Email: sales@grand-packing.com


Contact Us

Mob: +86-13706885851
         +86-13787413551
 Tel:   +86-731-84325468
 Fax:  
+86-731-84325498
Ask your questions by E-mail
sales@grand-packing.com

Language Options

Français              العربية               Pусский
Español          Português             한국어
Tiếng Việt            ไทย                Türk dili
Melayu           Bahasa indonesia
Product Inquiry